GridVax

National infrastructure index

U.S. physical economy intelligence

Facilities, interconnection queue, transmission, permits, and capital signals — unified, attributed, and refreshed from verified public sources.

Request enterprise briefing →
Facilities indexed
45K+
Active queue capacity
1.86 TW
State jurisdictions
51

Updated daily from verified public sources

GridVax · Infrastructure map

Active queue

8,476

Capacity

1.86 TW

Filter

data_center

Facility record

Loudoun Campus Phase III

Load
480 MW
State
VA
Queue
Active

Used by teams at infrastructure investors, utilities, and developers

Infrastructure fund
Regional utility
EPC contractor
Advisory firm
Hyperscale developer
Equipment OEM

How teams use GridVax

Infrastructure decisions need attributable ground truth

From underwriting and site selection to grid planning — one national index with cited sources and exportable datasets.

Infrastructure investing

Underwrite physical assets before the market prices them in

Screen interconnection backlog, transmission proximity, and operator portfolios from one attributable national index — exportable to internal models.

  • Screen queue backlog and transmission proximity by county
  • Model operator portfolios and planned capacity additions
  • Export facility and queue datasets to internal models

38K+

queue requests tracked

Learn more →

Project development

Site selection with queue and grid context

Compare wait times, substation headroom, and competitor buildouts before entitlements — with permits and procurement layered on the map.

  • Compare interconnection wait times and substation headroom
  • Map competitor campuses, fabs, and industrial expansions
  • Monitor permitting and procurement near target parcels

712K

transmission miles indexed

Learn more →

Grid planning

Load growth visibility across your footprint

Track large-load interconnection clusters, correlate queue volume with topology, and identify structural bottlenecks from graph metrics.

  • Track large-load interconnection and data-center clusters
  • Correlate queue volume with transmission topology
  • Identify structural bottlenecks from graph metrics

7

ISO/RTO regions covered

Learn more →

Geospatial module

One map for the physical economy

Filter by asset class, fuel, capacity, and region. Overlay transmission, substations, interconnection queue, and permits.

Infrastructure mapSample view

Active queue

8,476

Capacity

1.86 TW

Filter

data_center

Facility record

Loudoun Campus Phase III

Load
480 MW
State
VA
Queue
Active
Open map →Free base layers · no account required

Platform metrics

National coverage from verified public sources

EIA-860M, LBNL Queued Up, HIFLD, SEC EDGAR, FERC eLibrary, and USAspending — unified, attributed, refreshed daily.

Facilities indexed

45,247

Seven asset classes · 51 jurisdictions

+342 · 30-day net adds

Active queue capacity

1.86 TW

LBNL Queued Up · 7 ISO/RTO regions

+124 GW · YoY active MW

Transmission miles

712,400

HIFLD segments · voltage-class filterable

74K · Line segments

Queue requests

38,214

Active, withdrawn, and completed history

8,476 · Currently active

SEC filing signals

580+

EDGAR full-text · capex extraction

Daily · Ingestion cadence

Source attribution

99.2%

Per-record provenance and change log

9 · Primary data sources

Active queue by fuel (GW)
Planned capacity pipeline (GW)
Regional active queue
RegionActive projectsCapacity (GW)Share of national
ERCOT2,140130.9%
PJM1,680024.4%
CAISO920017.0%
MISO740011.8%
SPP52009.3%
NYISO38006.7%

Research catalog

Intelligence briefings

Quarterly and thematic reports synthesized from platform data. Methodology documented, sources cited.

Featured reports

GVX-2026-Q2-AI

AI Infrastructure Outlook 2027

Disclosed hyperscale capex exceeded $48B TTM. Virginia, Texas, and Ohio account for 62% of large-load queue additions.

+2.1 GW

TX large-load queue, Q2

Read →

GVX-2026-Q2-GRID

Grid Capacity Forecast

Solar-plus-storage hybrids are 18% of ERCOT active MW versus 9% two years prior. PJM withdrawal rates remain above historical median.

412 GW

Planned generation pipeline

Read →

GVX-2026-Q1-DC

Data Center Pipeline Report

14 substation interconnection filings in Loudoun-adjacent counties. Water and fiber constraints emerging in secondary markets.

1,642

Indexed data-center assets

Read →

Enterprise controls

Production-grade data handling

Infrastructure intelligence requires trust. Built for teams that cannot afford stale or unverifiable data.

Encryption

TLS 1.2+ in transit. Encrypted database volumes at rest on managed infrastructure.

Access control

Plan-gated API endpoints. Session and API-key scopes with per-tier export limits.

Enterprise SSO

SAML 2.0 for Enterprise accounts. Domain-verified provisioning.

Data provenance

Source, ingest timestamp, and change history on every facility record.

API metering

Per-key daily counters. Webhook delivery logs and usage reporting.

Data handling

Customer queries and alerts are not resold or used for model training.

See the build pipeline before it's news

Start with the free map. Create an account for dashboard preview, or request an enterprise briefing for your team.

GridVax

The Intelligence Layer for America's Physical Economy. National infrastructure data for investors, developers, utilities, and advisors.

Updated daily from verified public sources

Compliance

  • Security overview
  • Data handling policy
  • Source attribution

Data sources

EIA-860M · LBNL Queued Up · EPA TRI · SEC EDGAR · FERC eLibrary · USAspending · HIFLD · OpenStreetMap · BTS NTAD

Security program aligned with SOC 2 Type II control objectives. Enterprise SSO and audit logging available.

Customer queries, alerts, and exports are not resold or used for model training. All records include source attribution, ingest timestamp, and change history.

© 2026 GridVax. All rights reserved.

EIA · LBNL · SEC · FERC · USAspending · HIFLD